⚡ Pre-Launch Offer: ₹10,999/sq.yd. (Save ₹1,000/sq.yd.) • Till 20 OctView Plans →
Statutory Framework

A City Engineered for the Next Century

Dholera Special Investment Region (DSIR) is an ambitious greenfield industrial metropolis situated approximately 100 kilometers south-west of Ahmedabad, Gujarat. Established under the visionary Special Investment Region Act 2009 by the Gujarat State Legislature, Dholera benefits from full legal and institutional sovereignty.

The project is governed and executed by Dholera Industrial City Development Limited (DICDL), a premier joint venture between the Government of India (National Industrial Corridor Development and Implementation Trust - NICDIT) and the Government of Gujarat (Dholera Special Investment Region Development Authority - DSIRDA).

Total Region Area
920 sq. km

Larger than the geographical footprint of Singapore

Activation Area (TP1 & TP2)
22.5 sq. km

Trunk infrastructure, power, water & roads ready

Dholera SIR Master Town Planning Layout
Official Dholera SIR Town Planning Scheme22 Villages • 422 sq. km TP Development Area
Catalytic Infrastructure

The 9 Mega Projects of Dholera SIR

Massive state and union investments that are transforming Dholera into the world’s most sought-after industrial and residential destination.

SemiconductorsAnchor Project

Tata Semiconductor Fab

India's first commercial semiconductor fabrication facility being built by Tata Electronics with PSMC, catalyzing thousands of tech jobs.

✓ High Impact Economic Growth Driver
AviationPhase 1 Active

Dholera International Airport

Greenfield passenger and international cargo hub situated near Navagam, handling long-haul freighters and decongesting Ahmedabad airport.

✓ High Impact Economic Growth Driver
ConnectivityHigh Speed

250M Wide 6-Lane Expressway

Dedicated access-controlled expressway connecting Ahmedabad to Dholera SIR, cutting transit time down to under 50 minutes.

✓ High Impact Economic Growth Driver
Clean Energy₹1200 Cr Project

ReNew Power Solar Cell (2000 MW)

Massive solar module and cell manufacturing complex reinforcing Dholera as the renewable energy capital of western India.

✓ High Impact Economic Growth Driver
Green PowerClean Grid

World’s Largest Solar Park (5000 MW)

Giant solar park generating clean green power for DSIR zero-carbon industrial zone and surrounding metropolitan corridors.

✓ High Impact Economic Growth Driver
Rapid TransitEco Commute

Ahmedabad–Dholera Monorail

Dedicated mass rapid transit network connecting Ahmedabad city metro directly to Dholera activation nodes and smart city centers.

✓ High Impact Economic Growth Driver
GovernanceOperational

ABCD Smart Building

Administrative and Business Centre of Dholera—the command and control brain housing government authorities, single-window clearances, and city operations.

✓ High Impact Economic Growth Driver
IndustryGlobal Hub

Greenfield Industrial Smart Park

Dedicated plug-and-play zones equipped with recycled water, piped gas, zero-liquid discharge, and high-load industrial power feeders.

✓ High Impact Economic Growth Driver
InnovationTech Zone

Knowledge & IT Park

Dedicated education, R&D institutes, universities, and IT/ITES corporate campuses shaping high-value employment.

✓ High Impact Economic Growth Driver
Global Reach

Unrivaled Multi-Modal Transit Network

Dholera is conceived as a self-sustaining eco-system connected by air, road, rail, and sea. Its strategic position along the Gulf of Khambhat and direct link to the Western Dedicated Freight Corridor ensures effortless movement of cargo and human capital.

✈
International Airport Access

Designed with two parallel runways capable of handling wide-body commercial jets and 4E freight carriers.

🛣
250m Wide Access Expressway

Direct 6-lane link connecting Ahmedabad city center, Sanand automotive cluster, and Dholera in under 50 minutes.

🚆
Monorail & Metro Integration

High speed mass transit connection to GIFT City and Gandhinagar, facilitating daily executive commutes.

Capital Growth Potential

Why Early Plotted Land Buyers Win

Early investors in Gurgaon (DLF Cyber City) and Greater Noida (Yamuna Expressway) saw unprecedented 10x–20x appreciation over 15 years. Dholera SIR is being built with significantly higher sovereign capital backing and statutory planning than any previous Indian urban initiative.

Official Brochure Insights

The 5 Major Connectivity Pillars

Sanctioned multi-modal mega projects positioning Dholera as Western India's premier logistics and high-speed industrial hub.

01Approved Budget (Phase 1): ₹5,083 Cr

Dholera International Airport

Greenfield Passenger & Cargo Hub (Navagam)

1,426-hectare airport under active development near Navagam, just 3 km from Dholera SIR. Designed to handle 1.5M to 50M passengers annually with dedicated cargo terminals. First cargo flight operational by December 2026.

✓ 3 km from DSIR boundary✓ Handles wide-body freighters✓ Relieves Ahmedabad Airport
02Speed Limit 120 km/h: 109 km

Ahmedabad–Dholera Expressway

250m Wide 6-Lane Access-Controlled Highway

High-speed corridor linking Sardar Patel Ring Road near Sarkhej to Adhelai village (Bhavnagar), cutting transit down to under 50 minutes. Features a dedicated link road to Dholera Airport and provision to expand to 8 lanes.

✓ Under 50 mins to Ahmedabad✓ Expandable to 8 lanes✓ Direct Airport Link Road
03₹12,500 – ₹13,000 Cr: 100 km

Dholera Metro Rail Project

Elevated Mass Rapid Transit System (MRTS)

Sanctioned elevated high-speed metro linking Ahmedabad with Dholera Smart City in two phases (Phase 1: 61.55 km, Phase 2: 38.45 km). Engineered to transport up to 80,000 passengers/hour and 1.7 million users by 2031.

✓ Operational by 2027✓ Joint GoI & Gujarat initiative✓ Connects to Diamond Circle
04GMB Approved Investment: ₹110 Cr

Dholera Sea Port

Gulf of Khambhat Industrial Maritime Hub

Strategically located along the Gulf of Khambhat offering seamless maritime trade connectivity. Proximity to major ports: Kandla (334 km), Mundra (376 km), and Pipavav. Fully operational by 2027–2028.

✓ Natural deep-water harbor✓ Direct access to Western shipping✓ Bulk industrial cargo handling
05Sanctioned by Ministry of Railways: ₹466 Cr

Dedicated Freight Corridor (DFC)

High-Capacity DMIC Industrial Railway Line

Specialized heavy-haul railway corridor directly integrated within the Delhi–Mumbai Industrial Corridor (DMIC). Implemented by DFCCIL, facilitating high-speed transit of containers, steel, cement, and electronic components.

✓ Direct DMIC rail connectivity✓ Operational October 2025✓ Drastically lowers logistics cost
Heritage & Tourism

World-Class Tourism in Dholera’s Vicinity

Iconic cultural, heritage, and ecological landmarks accelerating leisure tourism and hospitality investments.

400 Acres • ₹3,500 Cr Budget

National Maritime Heritage Complex (NMHC)

📍 Saragwala Village, Lothal (15 km from Dholera)

World-class historic museum developed under Sagarmala by Tata Projects near the ancient Indus Valley Lothal dockyard. Features 14 maritime galleries, a replica of Harappan port, a 77m lighthouse museum (world’s tallest), theme parks, and a luxury Museotel. Phase 1A opens late 2025.

34 sq. km Grassland Reserve

Blackbuck National Park & Wildlife Sanctuary

📍 Velavadar, Bhavnagar (50–60 km from Dholera SIR)

One of India’s finest pristine grassland reserves established in 1976. Home to large herds of graceful blackbucks, nilgai (blue bulls), Indian wolves, striped hyenas, and 250+ bird species. Features safari watchtowers and nature interpretation centers.

Downloads Center

Official Project Documents

Download the verified 32-page brochure, allotment booking form, and payment terms sheets.

📘
Comprehensive Dossier

Official Project Brochure

32 Pages • Full Color•3.7 MB PDF

Complete project master plan, Dholera SIR 22-village TP schemes, 5 major connectivities, infrastructure benchmarking, and amenities.

📝
Allotment Document

Official Booking Form & Bank Details

2 Pages • Printable Application•128 KB PDF

Application form with personal, plot & nominee fields, enclosures checklist, terms of allotment, and official bank account remittance coordinates.

🏷️
Commercial Terms

Pre-Launch Offer & Payment Terms

1 Page • Official Flyer•897 KB PDF

Official pre-launch price sheet (₹10,999/sq.yd.), BSP schedule, PLC rules, milestones (25% in 10 days, 100% in 3 months), and 10% cancellation clause.

Be Part of India’s Landmark Smart City

Motiaz Prithvi is situated directly on the 6-lane Fedra–Dhandhuka Highway at Dholera SIR. Secure your plot today before public rates revert to ₹11,999/sq.yd.

Book Priority ConsultationExplore Motiaz Prithvi Township